Thursday, 13 August 2015

rudder repairs

Not much on this front, apart from the fact I have been able to finish off fitting the second cheat piece to the rubber.
Now that this is done the rudder can now be glued back together and the whole upper half of the rudder can be epoxied and repainted to match the yacht which is already been done in the meantime.

Once this is done then it is back down the boatyard to continue on with the lower hull and get it caulked and filled and made ready to be re-launch after the last of the underwater jobs are completed on the hull.

Any work on the upper half of the hull can be sorted out once she is back in the water so that the hull as a chance to take up.