Wednesday, 24 June 2015

Finally getting on with the hull seams and getting them filled with caulking cotton and putty

The starboard side seams have been opening up with the dry weather and the length of time the boat as been out of the water.

The port side forward showing the seams starting to get refilled putty ready for the get coat of undercoat to go over the putty to stop it from drying out before the boat goes back in the water and the boat has a can to take up.

  
A forward facing shot of the port side with the puttying finished off with the seams between the rubbing skrate and the waterline being done.

The side on view showing the size of the job. Just got to sort out the underwater seams and get them ready to re-caulk and re-filled with putty once more.