Wednesday, 12 November 2014

Fixing in the new ribs singlehandedly and making the new planks

Getting to grips with putting in the new ribs singlehandedly with the aid of a roofing prop

After refitting the new ribs then the beaching leg backing pad was able to be refitted.
 Two of the three new planks cut and thicknessed and ready to go back to the boatyard and be streamed to shape

Using the small stream box for the short planks.