Monday, 24 February 2014

The day was spent rubbing down boat items and its spars.

Monday was spent rubbing down lots of the smaller items of varnished items that are going to be put on the boat to fix the cabin sides together as well as varnishing the spars. The spar that I have not got round to sorting is the mast. All the other spars are getting their fresh coats of varnish. The next job on the boat is going to be sorting out the port side amidships and get the hull shape back into its correct position and then steam the new ribs back in place. Then get the two planks back in the bottom. Just waiting for the weather to sort its self out so can get on with the outside of the hull and sort the deck edge out so that the cabin sides can be put back in place.