Saturday, 16 November 2013

It is time to start making a start on sorting out the repairs on the Mai-Star II once more.

Now that the dust has settled on the changing work load, I now can plan to get on to doing some work on the hull of the yacht and make a start on getting her back together once more.
 
This is one of the many jobs that done over the next few months along with the new cabin sides and roof and the refitting of the port holes and new navigation lights to the cabin sides and also other jobs on the mast and a list of jobs to do in the cockpit. Which is has you see a little on the empty side and is a blank canvas in which it can be re-designed to fit a number of bits of equipment both above the floorboards and below.