Sunday, 6 October 2013

At long last, now I have the time to get going on the boat and get work on done on it.

After a long lay off work on the boat, it is now time to make a start on getting the cabin sides and roof back on and sealed up before the worse of the autumn and winter sets in and it will be difficult to get the work done out oside where the boat is. So the time to get on with the work is now. The main job to do is to sort out the deck to cabin side edge and make sure that this good. That way ensuring the same problem as before does not happen again. Once they are in place the refitting the deck beams and the roof can follow and the boat will be watertight from above. Then the work on replacing the damaged planks and ribs in the hull can get underway.