Wednesday, 24 July 2013

Now it is time to do some work to Mai-Star II to get her ready to go back in the water.


 Now that I have a few hours to spare. It is time to start work on the inside of the boat to get reay to fit the new cabin sides and roof.

This photo shows the plywood pattern fitted to the carlins and lined up with cabin front pattern on the port side 
 
This photo is of the starboard side showing the same thing as the port side.

 
 This photo shows the plywood pattern fitted up to the aft cabin bulkhead.
 
This photo shows the same as the port side the plywood pattern fitting the aft cabin bulkhead.

 
The next two photos show the old cockpit seats and the position of the manual bilge pump and gas bottle which is going to be changed and new seats and lockers are built in the cockpit for better use of the area.
 
The next two photos show the condition of the bilge which is in need of a coat of paint and a few old ribs in need of sorting out and replacing.